Category: No. 347 // June 2015

An overloaded floor accident waiting to happen

I was recently asked to inspect a PosiStrut floor that had been damaged after being loaded by a stockpile of plasterboard sheets. As soon as I heard this, I immediately advised the truss fabricator that the builder would need to be notified and that the affected area required a prop, as well as the removal of the stockpile to relieve the load.

Read More

Reaching for new heights

A major increase in the use of timber construction by architects and developers for mid-rise building projects will soon arise from proposed changes to the National Construction Code building height limits, due to wood’s appeal as a sustainable and economic construction material.

Read More

June 2015 News

Our new website, timbertradernews.com, is not just the place to go to read previous editions of the magazine – it now features exclusive online news, bringing you the stories as they happen. In this edition, we recap some recent online industry news you may have missed.

Read More
Loading

SUBSCRIBE

SUBSCRIBE

Newsletter Subscriptions

Categories

roadpod

Timber World Map

Download Now

Mitre 10

Home Timber and Hardware

The Termite Treatment Booklet

Download Now