Author: TTN Admin

An overloaded floor accident waiting to happen

I was recently asked to inspect a PosiStrut floor that had been damaged after being loaded by a stockpile of plasterboard sheets. As soon as I heard this, I immediately advised the truss fabricator that the builder would need to be notified and that the affected area required a prop, as well as the removal of the stockpile to relieve the load.

Read More

Truss Talk

Last week I visited a well-known Australian company’s warehouse. It was one of several in the area that had collapsed under the weight of hail in a recent severe storm.

Read More

Categories