Above: communal workspace
An innovative approach to timber architecture and lower-impact construction. By Michael Smith
Fisher & Paykel has established a purpose- built campus in Tāmaki Makaurau Auckland which will serve as the global home of the brand and a luxury appliance innovation centre for research, industrial design, engineering, marketing, digital product design, testing and green energy solutions.
Timber Trader News profiles the 11,500-square-metre, three-level mass timber office building at the centre of the campus, which officially opened on 23 October.
Designed with architecture practice RTA Studio as a continuous loop around a regenerated wetland oasis, the building touches the ground lightly.
Architect Richard Naish, Design Director and founder of RTA Studio, says, “We call it a ‘groundscraper’ because it does everything a skyscraper does, laid flat on the ground. It keeps people connected to one another, to the whenua [land] and to the landscape around them.”
The brief was broader than just creating a new office. Fisher & Paykel wanted a long- term home for innovation that would keep research, design, engineering, making and testing closely connected, while creating different environments for focused work, collaboration and social exchange. Carbon was also a consideration from the outset, influencing decisions involving structure, materials, energy, water and landscape. The regeneration of the former industrial site, connection to nature and the ability of the campus to evolve over time were also important parts of the response.
MATERIAL SELECTION
Mass timber became a major part of the workplace building in response to the carbon-led brief – although the project was not based on replacing concrete and steel wherever possible. Materials were selected according to performance.
Timber was initially considered for the adjoining research and testing facility, for example, but stringent vibration-control requirements combined with the brief for an open and flexible workspace led to the construction of a steel and concrete structure.
In the workplace building, the principal engineered timber elements are the exposed LVL diagrid and beams, together with CLT floorplates. The diagrid forms both the primary structural system and the principal architectural expression of the interior. It is made from New Zealand plantation pine and contributes significantly to the building’s lower upfront carbon impact.
The carbon outcome is now confirmed through life-cycle analysis: the mass-timber building is upfront carbon positive, with a net upfront carbon balance of –1,089 tonnes CO₂e (carbon dioxide equivalent) after emissions from material production and construction are accounted for. The diagrid itself contributes 1,480 tonnes CO₂e of biogenic carbon sequestration.
LVL was selected for the nodes and braces of the diagrid, and for the frame including primary and secondary beams, and central columns that act as a spine through the centreline of the building footprint. CLT was utilised for floors and roof with a small number of glulam beams where a curving geometry was required.
EFFICIENT USE OF TIMBER
The diagrid distributes gravity, wind and seismic forces through a network of relatively slender diagonal timber members, rather than relying on a conventional arrangement of large perimeter columns, beams and moment connections. Because the members follow the structural load paths, the system can use timber efficiently while reducing the need for substantial steel connections.
The system was first prototyped at Scion in Rotorua before being developed further for Fisher & Paykel. On this project, the challenge was to make it repeatable across a much larger building with continuous curves and more than 300 structural nodes.
A consistent timber node, digitally manufactured components and a limited family of details allowed the apparently complex form to be built as a disciplined kit of parts. The exposed diagrid also performs an architectural role, so structure and interior expression are largely one and the same. Although the building appears fluid, the structure is based on a disciplined modular geometry. Straight sections follow repeating eight-metre planning modules, while the curves are formed from repeating 22.5-degree wedges of consistent radius. Beam lengths and brace angles were rationalised so the same structural logic could continue from straight sections through the curves.
Dunning Thornton and RTA Studio established these geometric rules before detailed BIM (building information modelling) – and then used computational tools to set out the nodes with the precision required for a continuous 260-metre diagrid.

PRE-ASSEMBLY
Module standardisation via offsite manufacture and pre-assembly was central to the construction strategy. Rather than treating every part of the curved building as unique, the structure was rationalised into a limited family of repeatable components that could be digitally manufactured, checked and pre-assembled before being delivered to site in sequence.
Because of the scale of the project, the diagrid was produced as a digitally manufactured kit of parts rather than as large factory-assembled sections. Main contractor Naylor Love leased premises immediately beside the Red Stag TimberLab factory, creating a dedicated assembly yard where components passed directly from manufacture into quality assurance processes and pre-assembly coordinated by specialist mass-timber contractor Kobe Construction.
Using large set-up jigs to control the geometry, Kobe assembled individual components into manageable W-, V- and M-shaped modules before they were transported across Auckland to the site in erection sequence. A digital QA system used the millimetre-accurate manufacturing model to track individual timber elements, with components tagged, photographed and checked before installation.
NOT JUST AN OFFICE
The workplace is organised as a 16-metre- wide ribbon around a central wetland landscape. Its straighter sections provide quieter
spaces for focused work, while the curves open into atria, bridges, stairways and shared spaces designed for movement and exchange. The relatively narrow floorplate also brings daylight, views and natural ventilation close to working areas on both sides.
A key element is the Social Kitchen, positioned at the junction between the workplace and the research and testing facility. From there, people can see prototypes being assembled and move directly between social, design, engineering and testing environments. The intention is to keep the work of making and developing products visible rather than separating it from the wider life of the business.
EARLY-STAGE PROTECTION
Moisture management was treated as an important construction issue from the beginning – most notably through the ECI (early contractor involvement) phase with the main contractor.
The building was erected progressively in horizontal sections so the roof and façade could follow closely behind the timber structure. CLT surfaces were protected with membranes and taped laps, while particularly vulnerable LVL nodes were temporarily covered during construction. The façade system itself was prefabricated so it could be installed quickly, reducing the time the timber remained exposed.
Another aspect of the process was the factory application of a protective oil coating to all LVL members, with options tested with Red
Stag TimberLab to determine the best product for performance and finish.
RESILIENCE
Seismic and fire-rating requirements were considered closely in the structural design. Seismically, the long ribbon is divided into four independent structures separated by movement joints, allowing different parts of the building to move independently. The diagrid and CLT diaphragm were modelled together with three-dimensional analysis to understand the effect of the curved sections. Meantime the timber node that connects the diagrid elements together was developed using the most up-to-date New Zealand design guidance as well as international standards, with a full-scale prototype tested to verify its strength, stiffness and failure behaviour. The screws in the node connection act as a “fuse” to provide resilience in an earthquake, allowing seismic forces to be redistributed through the diagrid structure.
A notable challenge was using timber in such an unusual geometry for the floor diaphragm, as the CLT comes in panels, rather than a continuous concrete slab. Large seismic forces needed to be transferred between the panels, particularly at the curved sections of the buildings. Where required, localised steel chord plates were used to rigidly connect the CLT panels and floor beams together with diagonal fully threaded screws.
The diagrid and floor beam connections were also developed to minimise large, embedded steel elements. The timber connections primarily used screws and timber-to-timber bearing, allowing the structure to behave more predictably through charring in a fire than connections dependent on substantial concealed steelwork.
FIRE PROTECTION STRATEGY
Structural fire resistance was typically achieved using the char method, with all steel screws embedded and timber plugged. A minimal amount of steelwork was required to tie together the CLT floor and roof diaphragms, and for the long-span architectural stairs. This steelwork was fire- protected by encapsulation with industry- standard, non-combustible fire protection systems.
The overall fire load to the building was carefully considered as part of the fire engineer’s combustion calculation. Non- combustible linings were applied to the CLT to keep the fire load to an acceptable level, with prioritisation of exposed timber given to higher-profile areas where it was important to expose as much structural timber as possible in support of the project’s biophilic aspirations.
More specifically, the flooring substrate of the raised acoustic floor was non- combustible and approximately 60 per cent of the underside of CLT floors were also lined to encapsulate the timber. LVL beams, columns and diagrid frame were therefore able to be left exposed.
Early in the design process, an allowance for services reticulation was factored into the structural design, with primary and secondary beams designed with a substantial offset to make room for services running through the long building footprint back to the services cores.
An acoustic floor was also specified to meet Impact Insulation Class rating requirements – and was also utilised for running electrical services through the floor cavity. Together with the beam-offset strategy, the raised acoustic floor minimised the number of service penetrations required through the structural beams and allowed the timber structure above to remain exposed to view, showcasing the timber and enhancing the biophilic aspect of the design. This material has been prepared from information supplied by and attributable to RTA Studio and Dunning Thornton – Structural Engineers.